oktober 2013

29 oktober 2013

The Goondiwindi Sewage Treatment Plant (STP) plant was constructed in the late 1960’s.

28 oktober 2013
 
Malmberg Water AB ordered a sliding frame sludge silo with a net volume 125m3
The silo will store biological digested sludge with :
2 oktober 2013

SPIRAC will provide a prefabricated package treatment plant for the