October 1, 2015

Food waste receival and transport at SYSAV Biogas pre-treatment plant

SYSAV pre-treatment plant for food waste, Malmö:
Goodtech was entrusted with the delivery and installation of a receival and pre-treatment organic waste solution for biogas production at SYSAV in Malmö. The overall goal is to maximize recycling of material to energy and reduce the amount of landfill to a minimum. Goodtech assigned SPIRAC to provide a 45 m3 live bottom receiving bin as well as ten shaftless spiral conveyors used for the transport of food waste to and from waste equipment.

The plant is designed to treat up to 16 tons of separated food waste per hour. The equipment for receiving and transporting organic waste was delivered in autumn 2014 and has been running since the beginning of 2015.

 

OUR UPDATES

Latest News & Articles

GET A QUOTE FROM OUR SKILLED ENGINEERS

Start Planning Your Projects

    First Name

    Last Name

    Email

    How Can We Help?

    Country

    Attachments (Optional)



      First Name

      Last Name

      Email

      How Can We Help?

      Country

      Attachments (Optional)



      OUR FAQS

      Frequently Asked Questions

      Why Should You Buy From SPIRAC?

      Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

      Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

      Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

      Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

      Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

      only
      20%
      of wastewater is collected worldwide, and we aim to improve this
      we serve clients in
      60+
      countries worldwide