October 7, 2025

Inlet works for the Loggerheads WWTP

We were appointed to deliver the new inlet works package for the Loggerheads WWTP.

This comprised a new stainless-steel reception tank where the forwarded flows from Village TPS would be blended with the current Sanatorium flows before passing through inlet screens.

The inlet works package included:

  • Two FINEGUARD™ screens (duty/standby) sized for a 700mm wide x 1000mm deep channel, with each capable of screening 81 l/s.
  • A 7m screw conveyor capable of handling <3.0m3/hr.
  • Two SPIROWASH® screenings washing units, each capable of handling up to 2.5m3/hr volume. The units receive screenings from the screw conveyor and clean, dewater and compact the screenings, before discharging via press tubes into a skip.
  • Support structure for the packaged inlet works installed on dedicated concrete pad.
  • Full steel platforms and access stairs.

Loggerheads Sanatorium STW (2025)

 

OUR UPDATES

Latest News & Articles

GET A QUOTE FROM OUR SKILLED ENGINEERS

Start Planning Your Projects

    First Name

    Last Name

    Email

    How Can We Help?

    Country

    Attachments (Optional)

      First Name

      Last Name

      Email

      How Can We Help?

      Country

      Attachments (Optional)

      OUR FAQS

      Frequently Asked Questions

      Why Should You Buy From SPIRAC?

      Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

      Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

      Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

      Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

      Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

      only
      20%
      of wastewater is collected worldwide, and we aim to improve this
      we serve clients in
      60+
      countries worldwide