July 16, 2024

Bolivar Wastewater Treatment Plant Reaches Key Milestone with First FINEGUARD Screen Installation

The Bolivar Wastewater Treatment Plant Inlet Work Upgrade has reached a significant milestone with the installation of the first of the new screens. After a year of structural concrete work to construct the new inlet channels, the project has now moved to the major mechanical equipment installation phase.

The screen, designed by SPIRAC to remove solids from the wastewater stream, is the first of eight to be installed. Each screen is an impressive 6.2 meters high and 2.5 meters wide, capable of processing 210 megalitres of raw sewage per day, equivalent to over 2400 liters per second. This first installation follows an 18-month design and procurement process, with the screens being built in the UK and shipped to Australia earlier this year.

Mechanical and electrical fit-out will continue in the coming months, with the initial handover to SA Water scheduled for late 2024.

OUR UPDATES

Latest News & Articles

GET A QUOTE FROM OUR SKILLED ENGINEERS

Start Planning Your Projects

    First Name

    Last Name

    Email

    How Can We Help?

    Country

    Attachments (Optional)

      First Name

      Last Name

      Email

      How Can We Help?

      Country

      Attachments (Optional)

      OUR FAQS

      Frequently Asked Questions

      Why Should You Buy From SPIRAC?

      Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

      Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

      Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

      Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

      Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

      only
      20%
      of wastewater is collected worldwide, and we aim to improve this
      we serve clients in
      60+
      countries worldwide