Discover why investment in wastewater infrastructure is critical for protecting public health, preserving water resources and supporting a more sustainable future.
When solids handling equipment begins to show signs of wear, operators are often faced with a difficult decision: repair, replace, or continue operating at increased risk of unplanned downtime.
We will be exhibiting at IFAT Munich, the world’s leading trade fair for environmental technologies, taking place from 4–7 May. IFAT brings together industry professionals from across the global water, wastewater, and resource recovery sectors, providing a platform to showcase...
Operating costs in sludge storage and handling are driven by discharge reliability, minimal maintenance effort, and reduced operator involvement. Conventional sludge silos can struggle with sludge bridging, limited access for inspection, and material build‑up around the silo walls—often resulting in...
The SOLIDS Dortmund trade fair will take place on March 18–19, 2026, at the Dortmund Exhibition Center, covering Halls 4–7. More than 340 exhibitors and over 5,000 trade visitors are expected.
As we approach the festive season, it’s the perfect time to pause and reflect on the year that has passed. 2025 has been a year of growth, innovation, and collaboration, and we couldn’t have done it without the continued support...
The Cambridge Wastewater Treatment Plant in New Zealand is undergoing a major upgrade to meet the needs of a growing population and stricter environmental standards.
We were appointed to deliver the new inlet works package for the Loggerheads WWTP. This comprised a new stainless-steel reception tank where the forwarded flows from Village TPS would be blended with the current Sanatorium flows before passing through inlet screens....